Parameters

Approaches

Hybrid TLBO-PSO [Proposed]

TLBO

[1]

PSO

[8]

Congestion cost ($/h)

2787.70

5981.3

6951.9

ΔPG1

−297.5807

+38.1219

+23.135

ΔPG2

−12.1838

+0.7801

+12.447

ΔPG3

−3.275

+9.0766

+7.493

ΔPG4

−2.441

−0.0179

−5.385

ΔPG5

+28.7574

−432018

−81.216

ΔPG6

+28.5324

−29.9082

0

ΔPG7

−45.4485

+22.8093

+39.03

Total power rescheduled (MW)

418.2188

143.9158

168.70