Case No.

Contingency type

Congested lines

Power flow in line (MW)

percentage overload

Net power violation (MW)

Case 2.1

Simulating overload by capacity reduction of the lines between buses 5&6 and 6&12.

5 - 6

6 - 12

184.62

46.985

5.49

34.24

21.605

Case 2.2

Simulating overload by capacity reduction of the-lines between buses 5&6 and 6&12.

2 - 3

38.6

93

18.6