Parameters | Approaches | ||
Hybrid TLBO-PSO [Proposed] | TLBO [1] | PSO [8] | |
Congestion cost ($/h) | 1347.5 | 5306.5 | 5335.5 |
ΔPG1 | +71.0241 | −8.5876 | NR |
ΔPG2 | −15.9882 | +75.65 | NR |
ΔPG3 | −7.1258 | +0.012 | NR |
ΔPG4 | −5.5115 | +34.357 | NR |
ΔPG5 | −23.2332 | +31.4791 | NR |
ΔPG6 | −17.1719 | +17.83 | NR |
Total power rescheduled (MW) | 140.0547 | 168.088 | 168.03 |