Parameters

Approaches

Hybrid TLBO-PSO [Proposed]

TLBO

[1]

PSO

[8]

Congestion cost ($/h)

1347.5

5306.5

5335.5

ΔPG1

+71.0241

−8.5876

NR

ΔPG2

−15.9882

+75.65

NR

ΔPG3

−7.1258

+0.012

NR

ΔPG4

−5.5115

+34.357

NR

ΔPG5

−23.2332

+31.4791

NR

ΔPG6

−17.1719

+17.83

NR

Total power rescheduled (MW)

140.0547

168.088

168.03