Case No. | Contingency type | Congested lines | Power flow in line (MW) | Overload % | Total power violation (MW) |
Case 1.1 | Unavailability of the line between bus 1&2 | 1 - 7 7 - 8 | 150.46 138.78 | 15.74 6.75 | 29.24 |
Case 1.2 | unavailability of the line between bus 1&7 and load increment of 50% at all buses | 1 - 2 2 - 8 2 - 9 | 202.57 66.11 69.46 | 55.82 1.70 6.86 | 92.745 |