Capacitance | 110 KV | 220 KV | ||||
Nappe | Equilateral Triangle | Isocel Triangle | Nappe | Equilateral Triangle | Isocel Triangle | |
C12 (10−12 F/m) | 10.144 | 10.144 | 10.144 | 9.6136 | 9.6136 | 9.6136 |
C13 (10−12 F/m) | 9.1405 | 10.144 | 9.616 | 8.7076 | 9.6136 | 9.1382 |
C23 (10−12 F/m) | 10.144 | 10.144 | 10.144 | 9.6136 | 9.6136 | 9.6136 |
C10 (10−12 F/m) | 15.198 | 15.198 | 14.876 | 15.251 | 15.251 | 14.799 |
C20 (10−12 F/m) | 15.198 | 14.647 | 15.198 | 15.251 | 14.501 | 15.251 |
C30 (10−12 F/m) | 15.198 | 15.198 | 15.198 | 15.251 | 15.251 | 15.251 |