Description | Units | OCGT (New Entrant) |
Installed capacity | MW | 250 |
Capital cost | US$/kWh | 1200 |
O & M Cost (Fixed) | ₦/MW/Yr | 2,496,000 |
O & M Cost( Variable) | ₦/MWh | 920 |
Capacity Factor | % | 80 |
Auxiliary Requirement | % | 2 |
Economic life | Year | 20 |
Construction period | Year | 3 |
Sent-out efficiency | % | 34 |
Availability | % | 95 |
Fuel costs | $/mmBtu | 1.8 |