| Risk Level | Risk Description & Necessary Action |
| High | If an observation is assessed as high risk, correct measures are significantly required and corrective planning must be made as soon as possible |
| Medium | If an observation is assessed as medium risk, correct measures are moderately required and corrective planning must be made in a reasonable time frame |
| Low | If an observation is assessed as low risk, a decision has to be make whether corrective measures are required |