Scenario

Description

2038

2070

Np (Mbbl)

Wp (Mbbl)

Np (Mbbl)

Wp (Mbbl)

Base case

Four existing production wells

6376.93

(15.24%)

1394.14

6388.35

(15.26%)

1420.71

Water injection

Four existing production wells + one injector

7363.03

(17.59%)

12468.15

8929.06

(21.33%)

41629.87

Polymer injection

Four existing production wells + one injector

8196.42

(19.58%)

4036.27

12860.71

(30.73%)

30087.67