Physical parameter | Monitoring modality | Period of monitoring |
Magnetic induction | 2 time/day for 1/2 h every time | 1999-2018 |
Magnetic declination δ | - 2 time/day for 1/2 h every time - Continuous monitoring for half an hour at the time of the vocal sequences 8 and 9 | 1998-2013 2014-2018 |
β, γ particles | data every second 2 time/day for 1/2 h every time | 2003-2015 |
Radon 222 α particles | Continuous: PC connection basement, at 0.30 m from the floor | 2011-2018 |
Temperature | 2 time/day at the same hours In cellar and in Biglione creek | 1999-2018 |
Temperature | every 0.4 sec. Continuous: PC connection | 2013 |
Temperature, pressure/humidity | 2 time/day at the same hours | 2013 |
Water pH | 1 time/week SPSC/garden/Biglione | 2012-2013 |
Infra-sounds | 5 samples/second Continuous: PC connection | 2013-2016 |
EM signals | Continuous: PC connection | 2012-2013 |