WORKSTATION 1: ENGINE PREPARATION | ||
TASK DESCRIPTION | TASK CODE | PROCESSING TIME IN SECONDS |
EXHAUST/MUFFLER FITMENT | A2 | 135.5 |
ENGINE UNPACKING | A1 | 29 |
SHOCK ABSORBER | B3 | 71.5 |
DRIVE SHAFT FITMENT | A3 | 111.5 |
AIR BOX FITMENT | A4 | 77.7 |
FRONT CROSS MEMBER | A5 | 67.1 |
GEAR OIL | C3 | 45.3 |
TOTAL | 537.6 | |
CYCLE TIME | 576 | |
WORKERS | 4 | |
BALANCING LOSS | 6.70% | |
UTILIZATION | 93.30% | |
IDLE TIME | 38.4 |