| WORKSTATION 1: ENGINE PREPARATION |
||
| TASK DESCRIPTION |
TASK CODE |
PROCESSING TIME IN SECONDS |
| EXHAUST/MUFFLER FITMENT |
A2 |
135.5 |
| ENGINE UNPACKING |
A1 |
29 |
| SHOCK ABSORBER |
B3 |
71.5 |
| DRIVE SHAFT FITMENT |
A3 |
111.5 |
| AIR BOX FITMENT |
A4 |
77.7 |
| FRONT CROSS MEMBER |
A5 |
67.1 |
| GEAR OIL |
C3 |
45.3 |
| TOTAL |
537.6 |
|
| CYCLE TIME |
576 |
|
| WORKERS |
4 |
|
| BALANCING LOSS |
6.70% |
|
| UTILIZATION |
93.30% |
|
| IDLE TIME |
38.4 |
|