Concept | Costs (? |
Permits | 12,000 |
Drilling and finishing well (1000 m) | 160,000 |
Water collection | 20,000 |
Water removal | 1200 |
Electric energy | 10,000 |
Gas collection | 35,000 |
Total | 238,200 |