| Concept | Costs (? |
| Permits | 12,000 |
| Drilling and finishing well (1000 m) | 160,000 |
| Water collection | 20,000 |
| Water removal | 1200 |
| Electric energy | 10,000 |
| Gas collection | 35,000 |
| Total | 238,200 |