| S.n.o | Component | GHG emissions (Mt CO2eq) | Energy used (TJ) |
| Civil works | |||
| 1 | Secondary dam | 1357.92 | 19.17 |
| 2 | Main dam | 3828.31 | 54.79 |
| 3 | Main plant engineering | 3839.32 | 63.07 |
| 4 | Flood discharge/scouring sluice engineering | 773.40 | 11.60 |
| 5 | Overflow dam | 775.18 | 13.88 |
| 6 | Gravity dam and gate chamber section | 271.62 | 5.00 |
| Total | 10,845.77 | 167.54 | |
| Electromechanical equipment | |||
| 1 | Hydro-generator and installation | 398 | 8.56 |
| 2 | Auxiliary hydraulic machinery and installation | 3.3 | 0.067 |
| 3 | Electrical equipment and installation | 169 | 3.35 |
| Total | 570.3 | 11.977 | |