| Component | Cost in RMB (Yuan) |
| Secondary dam | 9,730,763 |
| Main dam | 26,745,007 |
| Main plant engineering | 88,312,099 |
| Flood discharge | 15,283,713 |
| Overflow dam | 25,803,062 |
| Gravity dam and gat chalber section | 8,377,865 |
| Hydro generator and installation | 53,038,208 |