Component

Cost in RMB (Yuan)

Secondary dam

9,730,763

Main dam

26,745,007

Main plant engineering

88,312,099

Flood discharge

15,283,713

Overflow dam

25,803,062

Gravity dam and gat chalber section

8,377,865

Hydro generator and installation

53,038,208