Component | Cost in RMB (Yuan) |
Secondary dam | 9,730,763 |
Main dam | 26,745,007 |
Main plant engineering | 88,312,099 |
Flood discharge | 15,283,713 |
Overflow dam | 25,803,062 |
Gravity dam and gat chalber section | 8,377,865 |
Hydro generator and installation | 53,038,208 |