Operation

Rp/t

USD/t

cutting and chopping

117

1.40

Raking and baling residue

595

7.14

Loading and unloading

364

4.37

First mile

305

3.66

USD/t at 50% m.c.

1381

16.57

USD/t at 0% m.c.

2762

33.14