Variable

BB

MK

Literature

Buildup function

Maximum buildup (kg/ha)

56

56

5.0 - 351,2 (kg/ha-day)

Buildup rate (/day)

1

1

13

Wash-off function

Wash-off coefficient

0.098

0.087

0.11 - 0.192

Wash-off exponent

1.79

1.53

0.0 - 32