| Factor | Frequency of visualization of the factor at the worksite | ||||
| Always | Often | Sometimes | Seldom | Never | |
| Accurate estimate of the volume of concrete to be used |
| X |
|
|
|
| Equal portions to concrete | X |
|
|
|
|
| Well-structured molds | X |
|
|
|
|
| Existence of control in the amount of concrete received | X |
|
|
|
|
| Big concretings |
| X |
|
|
|
| Pump does not retain concrete | X |
|
|
|
|
| Use of remaining concrete on the transport element |
| X |
|
|
|
| Request of remaining concrete consistent with the progress of concreting |
| X |
|
|
|
| Utilization of tools needed to control the level of concrete | X |
|
|
|
|
| There is no remaining concrete in the molds |
|
| X |
|
|
| Area of regular access | X |
|
|
|
|
| Little vibration of concrete in transportation | X |
|
|
|
|
| The thickness of the slab is not increased | X |
|
|
|
|
| Height of free fall of the concrete is less than 2 meters | X |
|
|
|
|
| Good operating of the elements of concrete transport | X |
|
|
|
|
| Encouragement of workers to minimize wastes |
|
|
|
| X |