Period

Start: 1 January 2014

End: 31 December 2014

Input data

NCEP FNL (6-hourly, 1˚ × 1˚)

Nesting

Two-way nesting

Domain

Domain 1, d01 (9 km, 86 × 68 grids)

Domain 2, d02 (3 km, 88 × 88 grids)

Domain 3, d03 (1 km, 100 × 100 grids)

Map projection

Mercator

Vertical layer

38

Geographic data resolution

10 m, 5 m, 2 m

Microphysics

WRF Single-Moment 5-class scheme

Longwave radiation

RRTMG scheme

Shortwave radiation

RRTMG scheme

Surface layer

MM5 scheme

Land surface

Noah land surface model

Planetary boundary layer

Yonsei University scheme

Cumulus parameterization

None