RES Technology | Guaranteed Tariff (?MWh) with grants | Guaranteed Tariff (?MWh) without grants | |
1 | On shore wind ≤ 5 MW (interconnected) | 105 | 85 |
2 | On shore wind > 5 MW (interconnected) | 105 | 82 |
3 | On shore wind (non-interconnected) | 110 | 90 |
4 | Small Hydro ≤ 1 MWe | 105 | 85 |
5 | Small Hydro (1 MWe to 5 MWe) | 105 | 83 |
6 | Small Hydro (5 MWe to 15 MWe) | 100 | 80 |
7 | Concentrated Solar Plants without storage | 260 | 200 |
8 | Concentrated Solar Plants with storage | 280 | 220 |
9 | Low enthalpy geothermal | 143 | 130 |
10 | High enthalpy geothermal | 110 | 100 |
11 | Biomass incineration ≤ 1 MW | 198 | 180 |
12 | Biomass incineration (1 MW to 5 MW) | 170 | 155 |
13 | Biomass incineration > 5 MW | 148 | 135 |
14 | Landfill Biogas ≤ 2 MW | 131 | 114 |
15 | Landfill Biogas > 2 MW | 108 | 94 |
16 | Anaerobic digestion biogas ≤ 3 MW | 230 | 209 |
17 | Anaerobic digestion biogas > 3 MW | 209 | 190 |
18 | Photovoltaics < 100 kW (interconnected) | 1.2*μSMPν−1* |
|
19 | Photovoltaics > 100 kW (interconnected) | 1.1* μSMPν−1 |
|
20 | Photovoltaics (non interconnected) | 1.1* μSMPν−1 |
|
21 | Household photovoltaics < 10 kW | 115 |
|