Processing math: 100%

Equipment

bF,k (mPts/MJ)

bP,k (mPts/MJ)

BD,k (mPts/s)

BL (mPts/s)

BPFk (mPts/s)

rb,k (%)

Compressor (AK)

6.85

8.08

182.89

0.00

0.00

18.11

Combustor (CC)

87.64

52.26

1895.37

0.00

1833.21

32.19

Gas Turbine (GT)

1541.57

1773.94

635.00

0.00

0.00

8.10

Heat Recovery Steam Generator (HRSG)

1.20

1.22

377.62

0.00

0.00

5.96

Pump (P)

0.03

0.03

1.61

0.00

0.00

15.07

Compressor (RK)

3.50

3.69

48.51

0.00

0.00

20.74

Steam Turbine (ST)

5.88

6.85

125.95

0.00

0.00

10.03

NGCC

3.50

1846.07

1598.18

27.67

1833.21

73.39