Designation

Unit cost ($)

Unit

Number of units

Cost ($)

Work achievable by family members

Pickaxe

8.91

2

17.82

-

Shovel

8.91

2

17.82

-

Measuring tape

21.38

1

21.38

-

Daba

5.34

2

10.68

-

Hoe

3.56

2

7.12

-

Pit digging

26.72

person

3

80.16

+

Wheelbarrow

71.25

1

71.25

-

Wastes collection

53.44

3

160.32

+

Watering during installation

44.53

person

5

222.65

+

Watering of vermicompost every 3 days

17.81

3 days

40

712.4

+

Turning

17.81

5

89.05

+

Bags

2.67

10

26.7

-

Harvest and transport

17.81

5

89.05

+

Total

1526.4