cycle*

type

Z ( = X + D )

constraints

(redundancy)

marginal diversity (MP)

processing

(X)

delay

(D)

integration

(Muda)

sharing(efficiency), EN

cost system

variable

cost

(marginal)

profit

variable cost

(EC)

fixed cost

value

(profit)

diversity (Z)

H(X)

1.609*

H(Y)

1.691**

T(X, Y)

1.197**

H0

1.5019**

H (X, ∆Y)

0.6111**

integrity ( L ¯ )

H(X, Y)

2.113**