Symbol

PROCESS

In addition to the general and specific range of each process, a few particular insta nces of interest are given below. These do not necessarily form new detail levels but rather constitute random items arisen from practice

P01

Production

a) Intake b) Collection c) Sewerage d) Pumping

P02

Transportation

a) Pipeline b) Sewer c) Canal d) Main outlet sewer

e) Pumping

P03

Treatment

a) Purification b) Waste treatment c) Disinfection

d) Reduction e) Reuse f) Recycling g) Reject

h) Landfill i) Manipulation j) Catalysts

k) Electrostatic precipitation l) Disinfestation

P04

Storage

a) Tank b) Warehouse c) Inventory

P05

Distribution

a) House connections b) Pumping c) Marketing

P06

Final destination

a) Elimination b) Final disposal c) Discharge

d) Dumping e) Drainage

P07

Improvement

a) P10 to P17 b) Development c) Conservation

P08

Safety

a) P10 to P17 b) Industrial safety

P09

Hygiene

a) P10 to P17 b) Other processes

P10

Control

a) Inspection b) Sampling c) Analysis

P11

Surveillance

a) Inspection b) Sampling c) Analysis

d) Epidemiological surveillance.

P12

Consultancy

a) National/International cooperation

P13

Information

a) Social communication networks

P14

Education*

a) Curriculum modification b) Environmentaleducation

P15

Social participation

a) Community participation (incl. NGO’s and society at large)

P16

Research

a) Community-linked research

P17

Risk assessment

a) Environmental evaluation b) EHIA**

c) Exposure assessment

P99

P01 to P17