| Sections | Subsections |
| General disposition of the work site (Work site), 27 items. | Organization and management of safety |
| Disposition of the worksite | |
| Order and cleanliness of the worksite | |
| Specific construction jobs (Jobs), 141 items. | Excavations |
| Masonry and walls | |
| Demolitions | |
| Finishing on walls, ceilings and floors | |
| Welding | |
| Cutting with oxyacetylene | |
| Work at height | |
| Electric works and air-conditioning | |
| Shoring | |
| Reinforcing steel work | |
| Concrete work | |
| Painting | |
| Aluminum and glass work | |
| Conditions and use of machinery and equipment (Machinery), 63 items. | Heavy machinery and light equipment |
| Scaffolding and ladders | |
| Air compressors | |
| Conditions, management and use of tools (Tools), 42 items. | General usage |
| Hand tools | |
| Electric tools | |
| Cutting tools | |
| Pneumatic tools | |
| Management and disposition of materials (Materials), 15 items. | General topics |
| Manual load | |
| Mechanical load | |
| Personal protective equipment (PPE), 81 items. | Head |
| Eyes and face | |
| Ear | |
| Respiratory system | |
| Hand | |
| Trunk | |
| Lower limbs | |
| Others | |
| Hygiene services (Hygiene), 7 items. | Sanitary services |
| Dining area | |
| Garbage management |