Materials

Development capacity

Percent

Area (meter)

Brick and iron

High

33.34

899,584

Concrete skeleton

Low

7.89

212,905

Metal skeleton

Moderate

12.20

329,140

Cement block

Moderate

30.61

825,987

Composite

Very high

10.16

274,208

Sun-dried brick and wood

Very high

5.80

156,688