Time

A/MW

B/MW

D/MW

Time

A/MW

B/MW

D/MW

Time

A/MW

B/MW

D/MW

1

258.625

29.771

243.854

9

248.625

44.771

233.854

17

288.625

44.771

223.854

2

258.625

29.771

243.854

10

253.625

44.771

233.854

18

288.625

59.771

223.854

3

258.625

29.771

243.854

11

253.625

44.771

213.854

19

268.625

59.771

203.854

4

278.625

29.771

243.854

12

253.625

44.771

213.854

20

268.625

59.771

203.854

5

278.625

29.771

243.854

13

283.625

44.771

213.854

21

268.625

59.771

203.854

6

278.625

29.771

243.854

14

283.625

44.771

213.854

22

268.625

59.771

203.854

7

248.625

29.771

233.854

15

283.625

44.771

223.854

23

268.625

59.771

203.854

8

248.625

44.771

233.854

16

288.625

44.771

223.854

24

268.625

59.771

203.854