Bus No.

Generation (MW)

Load (MW)

LMP ($/MWh)

1

195.44

-

36.819

2

36.37

21.70

38.382

3

0

24.20

39.818

4

-

67.80

40.574

5

-

17.60

40.085

6

10.33

11.20

40.206

7

-

-

40.546

8

26.83

-

40.537

9

-

29.50

40.550

10

-

19.00

41.048

11

-

13.50

41.106

12

-

16.10

41.619

13

-

13.50

41.330

14

-

24.90

42.392

Operating cost

8119.82 ($/hr)

Carbon tax

17.7750$/hr

LOLE

-

LOEE

-