| Technical aspect | Strongly disagree | Disagree | Neutral | Agree | Strongly agree | Mean score |
| Project staff are trained in order to equip them with technical expertise necessary to carry out M&E | 2 (2.8) | 3 (4.2) | 2 (2.8) | 44 (62.0) | 20 (28.2) | 4.0 |
| Technical skills are a huge determinant of how best M&E is done | 3 (4.2) | 42 (59.2) | 9 (12.7) | 12 (16.9) | 5 (7.0) | 2.6 |
| The project identifies skilled personnel to carry out the M&E functions | 5 (7.0) | 35 (49.3) | 23 (32.4) | 8 (11.3) | 0 (0.0) | 2.4 |
| The project’s design is flexible to achieve better project results | 4 (5.6) | 12 (16.9) | 38 (53.5) | 5 (7.0) | 12 (16.9) | 3.1 |
| Project training need analysis is done to ensure the right skills are acquired to manage the M&E activities | 3 (4.2) | 4 (5.6) | 12 (16.9) | 46 (64.8) | 6 (8.5) | 3.6 |