Sl. No

Parts

Activities

Machine Setting time (min)

MC Tool arrange a time (min)

Resource Arranging time (min)

Power Setting (min)

Manpower arranging time

(min)

Technician Time with a mechanic (min)

Total Time (min)

Before SMED

Small

33

72

86

2

0

0

193

Front

150

33

686

0

49

81

999

Back

93

0

458

20

18

39

628

Assembly

167

0

1684

86

50

0

1987

Total Time

443

105

2914

108

117

120

3807

After SMED

Small

33

72

86

2

0

0

193

Front

67

89

25

1

7

84

273

Back

74

4

38

2

5

276

399

Assembly

256

7

20

5

137

211

636

Total Time (min)

430

172

169

10

149

996

1926

Savings Time (min)

13

−67

2745

98

−32

−876

1881

CPMa ($)

0.06

Profit ($)/SMED

112.86