No. | Criteria | Compliant (Yes) | Compliant (No) | Total | Comments |
1 | Topography | 0.6 | 0.4 | 1 | Reclaimed mined-out areas. Reclaim stockpile areas. Use designated roots in wet seasons. |
2 | Geology | 0.8 | 0.2 | 1 | Separation of super soil from subsoil during removal. Proper grading and reshaping of the disturbed. |
3 | Air | 0.7 | 0.3 | 1 | Dust Suppression in the Dry season, Provision of masks to employees in dusty areas, Reduce speed limits. |
4 | Air | 0.6 | 0.04 |
| Future facilities with high noise impacts should be located well away from noise-sensitive areas. |
5 | Surface Water | 0.85 | 0.15 | 1 | Waste oil, fuel, and other lubricants should be stored in strong containments. |
6 | Visual Resources | 0.75 | 0.25 | 1 | Impoundment dams should be rehabilitated to meet international standards. |
7 | Accidental Release of Sludge from TSF | 0.90 | 0.01 | 1 | Rehabilitation, development, and implementation of the Tailings Management Plan coupled with a regular inspection program. |
8 | Wildlife Protected Areas and Cultural Properties | 0.01 | 0.90 | 1 | Not Frequently used. |
9 | Borrow Pits and Quarry Sites | 0.85 | 0.15 | 1 | The pits should be closed up immediately after use Quarry sites must be included in mines closure and reclamation plans |
10 | Flora and Fauna | 0.9 | 0.01 | 1 | Prompt mine reclamation activities in the mined-out areas should be enhanced.. |
| Total | 7.05 | 2.95 | 10 | (Approximation) |
| In Percentage | 70.50% | 29.50% | 100% | (Approximation) |
| In Degrees | 253.8 | 106.2 | 360 | (Approximation) |