CATEGORIES | PROBLEMS | EFFECT | SOLUTIONS |
PEOPLE | Grossly under staff | Ineffectiveness | Redeployment/Employment of required skilled personnel |
Work Overload | Reduced Productivity/Fatigue | Redeployment of required skilled personnel | |
PROCESS | Poor standards or procedures | Inconsistencies within the system | Improvements to manual (SOP) |
Less environmental focus | causing a lot of damage to the environment | Environmental focus | |
EQUIPMENT | Inadequate Machines for environmental works | under production | Provision of required plant and equipment |
Lack of maintenance | frequent breakdown | Improved maintenance culture | |
MATERIAL | Poor quality raw materials used | Unreliable results From Field Operation | Tolerable level set for quality control of material usage |
Inaccurate ordering/procurement procedures | Substandard material used | Enforcement of Procurement instructions/manuals |