| Task No. | Description | Start Date (ES) | Finish Date (EF) | Resources per day |
| 1 | Preliminary paper sketch | 1 | 1 | 5 |
| 4 | BWB UAV assembly and payload investigation & study | 2 | 3 | 2, 1 |
| 7 | Engine design investigation & study | 4 | 5 | 2, 2 |
| 10 | Structural Analysis | 6 | 9 | 3, 2, 1, 1 |
| 11 | Verification and Testing | 10 | 12 | 1, 2, 1 |
| 18 | Engineering drawings | 13 | 15 | 2, 1, 2, |
| 20 | Making of posters | 16 | 17 | 5, 4 |