Item

Description

Qty

Unit

Unit Price ($)

Amount ($)

1

Accessories

Black enamel paint

15

Liter

20.0

300.00

110 mm PVC Pipe

20

length

8.75

175.00

Watering can

3

NA

5.0

15.00

Flexible hose

600

m

0.38

228.00

Wheelbarrow heavy duty

2

NA

50.00

100.00

Thread tapes

12

NA

0.044

0.53

Shovels (excavation work)

4

NA

10.00

40.00

Hoes/handles (excavation work)

6

NA

4.38

26.28

Pails

3

NA

6.25

18.75

Black plastic sheet

2

NA

4.38

8.76

Butterfly valves

6

NA

6.88

41.28

G.I. Union

10

NA

0.63

6.30

G.I. Elbow

10

NA

0.63

6.30

G.I. Tee joint

10

NA

0.63

6.30

G.I. Socket

12

NA

0.63

7.56

G.I. Nipple

12

NA

0.63

7.56

G.I. Pipes

14

length

8.75

122.5

G.I. R. Bush

20

NA

0.63

12.60

Lime

10

kg

0.75

7.50

Paintbrush

4

NA

4.38

17.52

Wire brush

2

NA

4.38

8.76

Subtotal

1156.50

2

Building Materials

Bricks

20,000

NA

0.025

500.00

Transport

NA

NA

50.00

50.00

Cement (50kg)

60

Bags

10.00

600.00

Transport

NA

NA

50.00

50.00

Quarry stones

12

Tons

10.63

127.56

Transport

NA

NA

10.00

10.00

Fine Sand

4

Tons

2.50

10.00

Transport

NA

NA

18.75

18.75

Course sand

10

Tons

6.25

62.50

Transportui

NA

NA

10.00

10.00

Subtotal

1388.81