Figures

Est. 1

Est. 2

Est. 3

Est. 4

X = Annual Heat Input rate in ZJ

7.1

8.75

10.1

16.48

Y = Build up in years (duration of rate estimate + Gap before 2021 + 10 years for resettling system mobilization)

35 + 13 + 10 = 58

40 + 9 +10 = 59

41 + 13 + 10 = 64

43 + 7 + 10 = 60

Global Heat Reducing Components

Z = Outflow of Heat ZJ

Years required for restoration of pre 1960 status

IBWT Reversal, S/No. a, Table 2

14.235

58

94

156

Not*

As above + Northern Pakistan system S/No. a + b, Table 2

24.128

24

34

46

129

As above + Thar & Chulistan irrigation, S/No. a + b + c, Table 2

39.9

13

17

22

42