Activity Frequency

Component

Procedure

Hourly

Ash removal

Inspect and clean as required

Daily

Temperature, pollution monitors, if any

Check operation(Use control box) or physical stuck emmission)

Underfire air ports

Door seals

Ash pit

Inspect and clean as required

Inspect for wear, closeness of fit, air leakage

Clean after each shift

Weekly

Latches, hinges, wheels, etc.

Lubricate if applicable

Monthly

External surfaces of incinerator and chimney (stack)

Refractory

Upper or secondary chamber

Inspect external hot surfaces. White spots or discoloration may indicate loss of refractory.

Inspect and repair monitor wear with refractory cement.

Inspect and remove particulate matter accumulated in chamber floor.

Surface cleaning

Semi-annually

Hot external surfaces

Inspect and paint with high temperature paint.

Change own out parts

Ambient external surfaces

Inspect and paint as required