Activity Frequency | Component | Procedure |
Hourly | Ash removal | Inspect and clean as required |
Daily | Temperature, pollution monitors, if any | Check operation(Use control box) or physical stuck emmission) |
Underfire air ports Door seals Ash pit | Inspect and clean as required Inspect for wear, closeness of fit, air leakage Clean after each shift | |
Weekly | Latches, hinges, wheels, etc. | Lubricate if applicable |
Monthly | External surfaces of incinerator and chimney (stack) Refractory Upper or secondary chamber | Inspect external hot surfaces. White spots or discoloration may indicate loss of refractory. Inspect and repair monitor wear with refractory cement. Inspect and remove particulate matter accumulated in chamber floor. Surface cleaning |
Semi-annually | Hot external surfaces | Inspect and paint with high temperature paint. Change own out parts |
Ambient external surfaces | Inspect and paint as required |