Station | Subcatchments | NSE Daily & log Flow Duration (Calibration) | NSE Daily & log Flow Duration (Validation | DDFs | Melt Threshold | Taccum Threshold | Tfraction | x1 | x2 | x3 | x4 |
Tuini (P) | 1,2 | 0.79 | 0.72 | 2.13 | 3 | −0.27 | 0.23 | 1500 | −10 | 258.8 | 0.99 |
Yashwant Nagar | 3 | 0.71 | 0.60 | 0 | −3 | −3 | 1 | 66.34 | −4.55 | 500 | 0.74 |
Bausan | 5 | 0.77 | 0.65 | 3.44 | −0.95 | −0.97 | 0.87 | 1500 | −5.14 | 228.3 | 0.85 |
Haripur | 1,2,3,4 | 0.69 | 0.61 | 0 | −1.76 | 1.12 | 0.12 | 179.01 | −5.81 | 69.38 | 1.17 |
Poanta | 1, 2, 3, 4, 5, 7 | 0.85 | 0.73 | 0 | -3 | 2.93 | 0.41 | 30.02 | −9.41 | 191.1 | 0.96 |
HKB | 1, 2, 3, 4, 5, 6, 7 | 0.74 | 0.61 | 2.02 | 3 | -1.05 | 0.53 | 622.71 | 2.09 | 45.21 | 1.28 |