Station

Subcatchments

NSE Daily & log Flow Duration

(Calibration)

NSE Daily & log Flow Duration (Validation

DDFs

Melt Threshold

Taccum Threshold

Tfraction

x1

x2

x3

x4

Tuini (P)

1,2

0.79

0.72

2.13

3

−0.27

0.23

1500

−10

258.8

0.99

Yashwant Nagar

3

0.71

0.60

0

−3

−3

1

66.34

−4.55

500

0.74

Bausan

5

0.77

0.65

3.44

−0.95

−0.97

0.87

1500

−5.14

228.3

0.85

Haripur

1,2,3,4

0.69

0.61

0

−1.76

1.12

0.12

179.01

−5.81

69.38

1.17

Poanta

1, 2, 3, 4, 5, 7

0.85

0.73

0

-3

2.93

0.41

30.02

−9.41

191.1

0.96

HKB

1, 2, 3, 4, 5, 6, 7

0.74

0.61

2.02

3

-1.05

0.53

622.71

2.09

45.21

1.28