ID

Row

Column

Abstraction rate for each stress period (m3/day)

1

2

3

4

5

Abstraction well 1

10

4

−100.25

−100.25

−68

−16

−49

Abstraction well 2

10

8

−100.25

−80.2

−96

−100.25

−88