Seam

Sample No.

Moisture (%)

Ash (%)

V.M. (%)**

F.C. (%)

Fuel Ratio

C.V

Lajkura

L/5

11.4

16.6

28.8 (40.9)

43.2

1.5

5330

L/4

13.2

30.1

25.1 (46.7)

31.6

1.3

3980

L/3

16.1

29.7

24.4 (47.6)

29.8

1.2

3830

L/2

9.0

41.5

22.7 (50.0)

26.8

1.2

3490

L/1

15.5

19.9

27.4 (43.7)

37.2

1.4

4860

Rampur

RS5/T

9.7

22.8

28.5 (43.69)

39.0

1.4

4880

RS5/B

8.8

23.6

27.3 (43.86)

40.3

1.4

4950

RS4/T

8.1

30.8

22.4 (38.6)

38.7

1.7

4370

RS4/M

5.5

38.8

25.7 (49.5)

30.0

1.02

4060

RS4/B

10.9

25.8

23.2 (38.2)

40.1

1.7

4620

RS3/T

6.7

26.5

27.5 (42.86)

39.3

1.4

4970

RS3/B

5.7

33.9

24.4 (42.74)

36.0

1.4

4270

RS2/T

8.1

14.0

28.2 (36.86)

49.7

1.8

6010

RS2/M

6.3

24.8

27.7 (41.70)

41.2

1.5

5270

RS2/B

7.1

13.9

28.8 (37.10)

50.2

1.7

6100

RS1/T

6.2

40.4

17.2 (34.84)

36.2

2.1

3800

RS1/M

10.6

12.5

29.6 (39.12)

47.3

1.6

5710

RS1/B

8.6

13.6

31.4 (41.07)

46.4

1.5

5000

Ib

Ib/T

9.9

15.4

32.3 (44.14)

42.4

1.3

5390

Ib/M2

7.4

33.8

24.9 (44.92)

33.9

1.4

4280

Ib/M1

8.9

9.9

32.9 (41.01)

48.3

1.5

6660

Ib/B

12.1

12.6

31.6 (46.67)

43.7

1.4

5560