Levels of Partial Substitution (%) | Average Material Cost of Concrete (PhP/m3)* | Estimated Cost of Concrete Tile (PhP)** | Cost (PhP) of Concrete Paver/Tile (UEP made) | Margin for Profit (PhP) |
LS1 (0%) | 2459.50a | 3.50 | 13.00 | 9.50 |
LS2 (15%) | 2316.10b | 3.30 | 13.00 | 9.70 |
LS3 (30%) | 2172.60bc | 3.10 | 13.00 | 9.90 |
LS4 (45%) | 2029.15d | 2.90 | 13.00 | 10.10 |