Sub Catchment

Min (t/ha/yr)

Max (t/ha/yr)

Mean (t/ha/yr)

Sum (t/yr)

Priority N°

Zamra

0.02

464.22

8.60

1060287.35

1

Laatach

0.04

501.39

18.44

557208.25

2

Oued El Maleh Dam’s Upstream

0.05

442.12

8.35

191112.64

3

Oued El Maleh Dam’s Downstream

0.07

417.83

8.23

155600.64

4

Zahiwine

0.02

121.02

3.46

99758.39

5

Hassar

0.05

114.63

2.21

74757.30

6

Total

0.02

501.39

8.21

2138724.56