Trial

No.

Hopper Urea

holding

capacity, g (a)

Amount of Urea in

hopper after

operation, g (b)

Amount of Urea

released,

g (a-b)

Design Capacity

Operating speed (km/h)

kg/h

ha/h

Aus/Aman season

1

2000

1640

360

21.60

0.168

2.07

2

1677

323

19.98

0.156

1.96

3

1696

304

18.24

0.147

1.84

4

1649

351

21.06

0.166

2.07

Average

20.22

0. 16

1.99

Standard deviation

1.4818

0.0097

0.1096

Boro season

1

2000

1435

486

29.16

0.166

2.07

2

1320

532

31.92

0.175

2.19

3

1180

493

29.58

0.157

1.96

4

1088

472

28.32

0.147

1.84

Average

29.75

0. 16

2.02

Standard deviation

1.5417

0.0120

0.1497