Sr. No.

Item

Traditional Method

Integrated Approach

1

Main equipment

Multi-frequency single beam echosounder, digital printer data (tabular), time tagging machine, mini rangers, theodolites, power batteries, wireless radio, control station (Burgee)

Multi-frequency single beam echosounder, Differential GPS, Power source

2

Software

Hypack®, Bathy 2010

3

Survey crew

About 15 persons

3 persons

4

Time

Six weeks required covering whole reservoir

One week

5

Post processing/ Calculations

Eight weeks

One week

6

Preparation of maps and other products

Twelve weeks after completion of survey

One week after completion of survey

7

Product’s type

Contour map of reservoir surface, stage-storage relationship, reservoir capacity

Reservoir’s under water terrain, storage capacity, stage storage relationship, three dimensional reservoir surface