Period | Flow into UL by Pump 3 (m3∙s−1) | Flow into ML by Pumps 1 + 2 (m3∙s−1) | Total flow (m3∙s−1) |
1-May-12 to 15-Jul-12 | 6 | 4.2 | 10.2 |
16-Jul-12 to 10-Jan-13 | 3.6 | 2.52 | 6.12 |
10-Jan-13 to 1-Jun-13 | 3 | 3.5 | 6.5 |