Internal (I) Criteria | Fuzzy Weight | Defuzzified Weight | |
I1 | Water depth | (0.1399, 0.1464, 0.1537) | 0.1467 |
I2 | Crane productivity | (0.1478, 0.1554, 0.1634) | 0.1553 |
I3 | Ship Turnaround time | (0.1496, 0.1563, 0.1639) | 0.1567 |
I4 | Quay Length | (0.1263, 0.1325, 0.1394) | 0.1323 |
I5 | Volume handled | (0.0961, 0.102, 0.108) | 0.102 |
I6 | Dwell time | (0.0943, 0.0998, 0.1053) | 0.0997 |
I7 | Terminal area | (0.0811, 0.0867, 0.0914) | 0.0863 |
I8 | Handling cost | (0.1149, 0.1208, 0.1274) | 0.121 |
Sum | 1 |