Primary Energy

In Operation

Under Construction

Not Started

Power Granted (kW)

Power Inspected (kW)

Power Inspected (%)

EOL

100

3

49

4,677,340.00

2,577,840.00

48.18

UFV

31

9

167

8,463,056.00

708,956.00

13.25

UTE

30

-

1

3,635,576.10

2,063,688.10

38.57

Total

161

5

196

16,755,972.10

5,350,484.10

100