Result of the Project Work | |||||||
Project Parameters | Project Materials | Quantity/ Machine (1 Day) | Avg. Eff (%) | Cost/Machine (1 Day) | Reduction/ Machine (1 Day) | Savings/100 Machine (1 Day) | Savings/Year (For 100 Machines) |
Air Consumption Reduction | Regular Nozzle | 66.87 CFM | 96.08 | $27.73 | 10.09 CFM | $419 | $152,935 |
Energy Savings Nozzle | 56.78 CFM | 96.34 | $23.54 | ||||
Waste Reduction-Auxiliary Selvedge Waste | 8 Warp Waste (Regular) | 0.52 lbs | 96.34 | $0.91 | 0.07 lbs | $13 | $4745 |
7 Warp Waste (Experimental) | 0.45 lbs | 96.47 | $0.78 |