Result of the Project Work

Project Parameters

Project Materials

Quantity/ Machine (1 Day)

Avg. Eff (%)

Cost/Machine (1 Day)

Reduction/ Machine (1 Day)

Savings/100 Machine (1 Day)

Savings/Year (For 100 Machines)

Air Consumption Reduction

Regular Nozzle

66.87 CFM

96.08

$27.73

10.09 CFM

$419

$152,935

Energy Savings Nozzle

56.78 CFM

96.34

$23.54

Waste Reduction-Auxiliary Selvedge Waste

8 Warp Waste (Regular)

0.52 lbs

96.34

$0.91

0.07 lbs

$13

$4745

7 Warp Waste (Experimental)

0.45 lbs

96.47

$0.78