Articles | Mathematical Modeling | Hospital Based Outcome | Pre-Hospital Based Outcome | Flexibility | General Modeling |
Bayram, et al. [1] 2011 | HACSC6 = EDB/EDT = HBC * 0.18 | ++++ | +++ | + | + |
Hirshberg, et al. [7] 2005 |
| ++++ | − | +++ | − |
Rivera et al. [10] 2006 | 75 patient/6 hour/Level II 117 patient/6 h/Level I (ED Beds = m25) | ++ | − | − | − |
De Boer, et al. [11] 1999 | 0.5 - 1 patient/h/100 hospital bed to 2 - 3 p/h/100HB/8h | ++ | − | − | − |
Halpen et al. [8] ; 2003 | HBSC = (15% − 20%)*HBC | + | − | − | + |
Hick et al. [9] ; 2004 | HBSC = (10% − 20%)*HBC | + | − | − | + |