Type

Level indicators

The secondary indicators

Nature

AHP

entropy weight method

combination weight

P

Human resource conservation and occupational health and safety (0.0808)

Saving of human resources A11

ration

0.0140

0.1011

0.0575

Occupational health and safety A12

qualitative

0.0444

0.0000

0.0222

Personnel organization management (0.0943)

Organize and manage green construction personnel A21

qualitative

0.0377

0.0406

0.0391

Coordination of professional subcontracting A22

qualitative

0.0226

0.0259

0.0243

Personnel change in project department A23

qualitative

0.0132

0.0485

0.0309

Satisfaction of surrounding residents (0.0719)

Noise control A31

qualitative

0.0328

0.0525

0.0427

Light pollution control A32

qualitative

0.0149

0.0436

0.0293

Safety and health management (0.1478)

Safety precautions A41

qualitative

0.0656

0.0149

0.0402

Health and epidemic prevention management A42

qualitative

0.0338

0.0485

0.0411

Fire control facilities A43

qualitative

0.0212

0.0237

0.0224

Emergency response plan A44

qualitative

0.0487

0.0393

0.0440

S

Land resources conservation and utilization (0.0568)

Vertical conveyance B11

qualitative

0.0250

0.0059

0.0154

The construction of road B12

qualitative

0.0146

0.0102

0.0124

Effective utilization of temporary facilities B13

ration

0.0235

0.0344

0.0290

Saving and utilization of building materials (0.0640)

Local rate B21

ration

0.0169

0.0007

0.0088

Loss rate of major building materials B22

ration

0.0190

0.0229

0.0209

Ratio of waste to building materials B23

ration

0.0253

0.0051

0.0152

Utilization rate of green materials B24

ration

0.0379

0.0003

0.0191

Energy conservation and utilization (0.0754)

Proportion of energy saving equipment B31

ration

0.0372

0.0004

0.0188

Power savings B32

ration

0.0196

0.0546

0.0371

Green energy utilization measures B33

qualitative

0.0389

0.0001

0.0195

Water resources conservation and utilization (0.0455)

Non-traditional water utilization B41

ration

0.0138

0.0154

0.0146

To save water B42

ration

0.0284

0.0057

0.0170

Utilization rate of water-saving equipment B43

ration

0.0277

0.0000

0.0138

R

Protection of surrounding resources (0.0742)

Soil conservation C11

qualitative

0.0082

0.0187

0.0134

Measures to prevent settlement around foundation pit C12

qualitative

0.0184

0.0116

0.0150

Protection of groundwater resources C13

qualitative

0.0200

0.0182

0.0191

Pipeline protection C14

qualitative

0.0217

0.0317

0.0267

Environmental protection (0.1405)

Dust management C21

qualitative

0.0160

0.0639

0.0400

On-site enclosure management C22

qualitative

0.0132

0.0227

0.0179

Toxic substance control C23

qualitative

0.0839

0.0213

0.0526

Wastewater treatment C24

qualitative

0.0438

0.0253

0.0345

Construction waste management (0.0687)

Resource reduction C31

qualitative

0.0444

0.0297

0.0371

Garbage disposal C32

qualitative

0.0317

0.0316

0.0317

Innovative technology and measures (0.0755)

“Four new” technology application C41

qualitative

0.0090

0.0050

0.007

Building assembly rate C42

ration

0.013

0.1241

0.0685