| GIS model | ||||||
Scenarios | Facility location (FL) | Transportation problem (TP) | |||||
Open DCs | Average cost (Km) | Total cost (106 Km) | Capabilities (Kg) | Total cost (106 Km) | |||
1 | Allocating the municipality-customers to the existing DC in Poços de Caldas. | A | 212 | 820 | 3,861,936 | 820 | |
2 | Opening a new DC, before the existing DC in Poços de Caldas. | A, B | 121 | 461 | 1,930,968 | 506 | |
3 | Opening two new DCs, before the existing DC in Poços de Caldas. | A, B, C | 101 | 383 | 1,287,312 | 503 | |
4 | Opening three new DCs, before the existing DC in Poços de Caldas. | A, C, D, E | 83 | 315 | 965,484 | 402 | |