GIS | Features | Facility location (FL) | Transportation problem (TP) | |||
Existing factories | New factories | Average cost (Km) | Total cost (Km) | Maximum capacity | Total cost (Km) | |
1 | 0 | 1 | 209.3 | 34,954 | 167 | 34,954 |
2 | 1 | 1 | 142.1 | 23,740 | 84 | 24,034 |
3 | 1 | 2 | 117.4 | 19,609 | 56 | 22,177 |
4 | 1 | 3 | 93.3 | 15,591 | 42 | 16,913 |