Estimated

Constructions

Constructions Data and Estimations

Total

Real Area (m2)

Reference Group Most Similar Cost

(Real Area)(INCC/m2)

Estimated TCC (INCC)

Total Cost

Incurred (INCC)

Estimation Deviation (%)

1

15.19552

2.49

37.89174

39.88254

−5.3%

2

60.34829

2.47

149.19940

137.78187

7.7%

3

11.51920

3.23

37.23440

37.77413

−1.4%

4

17.32284

3.17

54.88357

55.24855

−0.7%

5

3.85126

3.86

14.85304

15.01165

−1.1%